Video Collection
(right click to download and save; Xvid codec required to play these videos)
Systems Integration Test - 13 August 2005
Tested at Prior Lake High School, Prior Lake MN. Special thanks to Dr. Craig Olson for usage of the facilities.
First Run (14.6mb)
Second Run (38.6mb)
Engine Test Performed on 2 May 2005
The SimJet Nexus engine was tested at the Stoughton facility from 1300-1500 on 2 May. 3 successful runs were conducted.
Test 1 (33.8mb) - No thrust vectoring
Test 2 (40.1mb) - Thrust Vectoring
Test 3 (32.8mb) - Thrust Vectoring
Aesalon Mold Construction Video - 12 Feb 05 (10.51mb)
Aesalon Mold Construction Video - 5 Feb 05 (11.01mb)
Rear Landing Gear Motion Analysis Phase 2 - 30 Jan 05
Front View of Gear Deployment (1.03mb)
Rear View of Gear Deployment (1.32mb)
Underside View of Gear Deployment (1.49mb)
Back Isometric View of Gear Deployment (4.74mb)
Front Isometric View of Gear Deployment (4.19mb)
Preliminary Rear Landing Gear Motion Analysis - 29 Jan 05
Front View of Gear Deployment (1.44mb)
Rear View of Gear Deployment (1.57mb)
Underside View of Gear Deployment (906 kB)
Back Isometric View of Gear Deployment (1.94mb)
Front Isometric View of Gear Deployment (1.54mb)
Phase Two of Wing Sweep Motion Analysis - 27 Jan 05
Integrated Wing Sweep (with airframe shown) (2.46mb)
Top View of Wing Sweep (3.68mb)
Closeup Top View of Wing Sweep (5.53mb)
Isometric view of Wing Sweep (3.85mb)
Preliminary Variable Wing Sweep Motion Analysis - 22 Jan 05
Preliminary Thrust Vector Design Motion Analysis - 20 Jan 05